HEC Derwent Scheme
Construction of the Derwent hydropower scheme began in 1934 and the last power station was commissioned in 1968.
There are two sections in the Derwent hydropower scheme – the upper and lower. This is because of the difference in how the water is stored in the sections. Visually the scheme resembles a Y shape.
The upper section of the scheme uses larger, deeper lakes for water storage than the lower section. The four main power stations in the upper section release water when it is needed to generate electricity. The upper section is formed from the Nive River system in the east and the Derwent River system in the west, making up the top of the Y.
The lower section is called run-of-river, which means water flows to power stations directly from a river, and cascades through a series of power stations. This means the same water is used to generate energy multiple times. There are six power stations in the lower section and they use water from the Derwent River multiple times. The lower section forms the ‘tail’ of the Y.
Woodward's Canal
The water from Bronte Lagoon is feed into Brady's Lake through Woodward's Canal. The narrow nature of this canal and ability to turn on and off the water at will has lead to the installation of the Brady's Lake Slalom Course in this canal. The course is 600m and ranked as a Grade 3 Difficulty course, taking around 3 minutes to paddle
Hints
Thneq Envy |
|
Decode |
Logs
Thanks Budgietas
Planned this trip to complete your HEC Derwent River Series over 11 - 13th August
On the way up, I found those left in Tassie Trekker's Series around Lake Crescent and Interlaken, before stopping at and staying two nights at the Great Lake Hotel
Today, I achieve my goal and completed your series with a round trip (from the pub and return) of of 177km; covering many loved fishing areas
Nineteen of your caches were found using 6698 steps in covering 5.3km on foot
The weather - very cold early morning, unlike yesterday no rain today until the nineteenth cache was completed - otherwise sunny and fine!
This cache was Sainted at 1127 hours
Great spot, great view
Another great fishing spot
Have canoed here as well
Thanks for the cache
Cheers
OldSaint
Accurate coordinates and the hint led to a quick find. The cache and contents were in good condition. Thanks Budgietas for the cache.
This is one impressive HEC scheme and we appreciate the time and effort gone into highlighting these locations.
Many thanks Budgietas for bringing us here. We shared a joint *FTF* with whitewebbs.